Active Project: 747 square foot attached ADU
Attached Accessory Dwelling Unit ADU SITE PLAN OVERVIEW This TRUPLANS INC project is currently being permitted for an attached ADU. The site plan shows the project area of the attached ADU section (shaded in grey). ARCHITECTURAL INTEGRATION Since the attached ADU is on both the left side and front elevations of the existing home it has been designed to architecturally mirror the right side of the existing house. We will share this design with you in upcoming blogs by Jake Dailo (Chief Planning Officer for TRUPLANS INC).The rest of the existing home is being upgraded as well. Therefore, the ADU will become integrated (attached) to the existing structure. ADU ACCESS ENTRY The entry of the ADU is on the left side of the home. The Orange County building department indicated that they do not want to see two entrances on the front of the house. Therefore the entrance to the attached accessory dwelling unit is on the left side out of view from the street. Watch this blog for updates on this live project. Permits expected March 2020.
0 Comments
Leave a Reply. |
AuthorChris Doering, co-founder of Truplans Archives
May 2023
Categories |